MWA assisted with the site layout to establish traffic routing, operational staff circulation, structure layout, and views of the new facilities from adjoining roadways. We also provide design for areas that include a chemical building and storage, control area, basins, filter and ozone gallery areas, raw water and high lift pump stations.
Client: CDM
Cost: $34 Million
Completion: 2008
